The printer is one trade. CCE 3D CM runs the whole job around it: preconstruction, schedule, superintendent, site safety, QA/QC and every trade that works on a printed footprint, from first budget to final inspection.

34years of construction leadership
$1.6B+in completed projects
5floors of printed design
CCE 3D CM, 3D Construction Management logo
How we run a printed job

One schedule. Every trade.

Printing changes the order of work. We build the schedule around the print so the foundation, MEP, roof and inspections land when the walls are ready.

Services

What we manage.

We provide the field leadership a printed project needs, on our own projects, for CCE franchise partners, or for any owner or prime contractor.

Project management

Budget, schedule, submittals, RFIs, change orders and owner reporting from one accountable team.

Superintendent

Full-time field leadership on site, coordinating the print crew and every follow-on trade day to day.

Site safety

Site-specific safety plans, daily safety briefings, and safety procedures for working around the printer and the pump.

QA/QC

Material testing, layer and dimension checks, reinforcement and embed inspections, and documented hold points.

Preconstruction

Feasibility, printable design review, estimating, value engineering and the permit path for printed walls.

Trade coordination

Scopes, sequencing and handoffs for MEP, roofing, windows and finish trades working on printed walls.

The CCE scope method

Who does what around the printed footprint.

Most trades have never built on printed walls. Our methodology defines each trade's scope, timing and handoff around the print, so bids are complete and nothing falls between trades.

WorkWhoWhenWhat the trade needs to know
Foundation & slabConcrete subBefore printPrint-path layout, starter bars and embeds set to the printed wall line.
Printed wallsPrint crewPrint phaseOpenings, chases and lintel pockets come from the print file, not the field.
ReinforcementPrint crew Rebar subDuring printVertical and horizontal steel placed at set layer heights, with inspection hold points.
MEP rough-inMEP tradesPlanned before printRoutes run through printed chases and conduit sleeves, so layouts are fixed in preconstruction.
Floor & roof structureStructural subAfter each levelBond beams and bearing details are printed in; multi-story work alternates print and deck.
Windows, doors, finishesFinish tradesAfter printRough openings are printed to tolerance; finishes go on textured or smoothed walls.
Inspections & QA/QCCCE 3D CMEvery phaseHold points, testing records and code documentation for the building official.
Delivery models

Hire us the way your project is bought.

Owner hires us directly

Construction manager

We manage the job for the owner from preconstruction through closeout.

Single point of responsibility

Design-build

Design, printing and construction under one contract with one schedule.

You have a builder

Owner's representative

We protect the owner's budget, schedule and quality while another builder delivers.

You're the prime

Printing subcontract

We take the printed-wall scope, with superintendent, safety and QA/QC included.

Federal & public work

Built for how government buys.

Our leadership has spent decades delivering federal construction: barracks, facilities and infrastructure for defense and civilian agencies. We team with primes and set-aside partners and run the field side of the contract.

Discuss a teaming opportunity
Agencies
  • DOD
  • DOE
  • VA
  • USACE
  • GSA
  • NAVFAC
  • Border Patrol
Contract vehicles
  • IDIQ
  • JOC
  • SABRE
  • MACC
  • MATOC
  • SATOC
  • Design-Build
Teaming & set-aside partners
  • 8(a)
  • ANC
  • Tribal
  • SDVOSB
  • WOSB
  • HUBZone
What we deliver

Printed projects we like.

Two-story printed building under a gantry printer
Multi-story housingTwo- to five-story printed buildings
Gantry printer printing a multi-room building
Barracks & facilitiesMilitary and government buildings
Printed community under construction
CommunitiesWorkforce, veteran and rural housing
Robotic arms printing a long wall on rails
InfrastructureSound walls, barriers and seawalls
Expanding the market

Taller buildings. Trained trades.

5 floors

We are pushing printed design to five stories, managing the alternating print-and-deck sequence that multi-story printed work requires.

MEP training

Training programs for mechanical, electrical and plumbing trades, plus our scope method, so designers, engineers and subcontractors can plan, bid and build printed projects with confidence.

Ask about training →
Portrait of Joe Clark
Leadership

Joe Clark

Founder

Joe Clark is a seasoned leader in federal construction, bringing 34 years of expertise in project management, contracting and strategic partnerships. A U.S. Army veteran with a track record of delivering over $1.6 billion in completed projects, Joe has built a reputation for navigating complex federal contract vehicles and fostering growth within SBA programs.

At CCE 3D CM he brings that discipline to 3D-printed construction: superintendent leadership, site safety, QA/QC and project management that meet both mission-critical and lifecycle-driven needs.

Start a project

Tell us about the job.

A few details help us route your request and come back with the right next step: a scoping call, a feasibility review or a teaming conversation.

  1. We review your request within two business days.
  2. A project lead calls to scope the work.
  3. You receive a proposal or teaming outline.

CCE 3D CM · 221 Trellis Blvd, Leander, Texas 78641

Services needed